Tuesday, December 17, 2013
Painting the Walls
Seems a bit lame to post these pictures of interior paint because the paint color is the same color as the drywall mud and it all basically looks the same as the drywall pictures, but oh well.....in keeping with photographing all the progress for future reference....here are some pictures of the painting!!!!!!
Sunday, December 15, 2013
How To Add Falling Snow To Your Blog
***
How to add snowfall effect to blogger page:
1. Go to blog layout.
2. Click on any of the "add a gadget".
3. Choose the HTML/JavaScript option.
4. Paste the code below into the content box. Leave the title blank.
5. Press the save button.
<script type="text/javascript" src="http://www.skincorner.com/snow.js">
</script>
6. Preview blog and if you like it hit save arrangement.
** Many of the codes don't work on an ipad, this one does.
ENJOY!
If it's not winter season and I've removed the gadget from my template, here is a screen shot of how it looks.
If it's not winter season and I've removed the gadget from my template, here is a screen shot of how it looks.
Thursday, December 12, 2013
Stucco Starts and Interior Painting
Stucco guys were there this morning and already moving along fast. Interior painting is also underway, but I haven't taken any pictures. This stucco is in a smooth finish. It has sand in it and isn't really that smooth, but that's what they call it. The outside will get painted with an elastomeric (stretchy) paint, so that it doesn't crack. The color will be creamy white. I matched a paint chip at home depot, the color is Behr's Wax Sculpture.
This is the color (wax sculpture) of the elastomeric paint the exterior of the house will get after the stucco completely dries. It takes a week or so to dry if it doesn't rain.
Thursday, December 5, 2013
Before Painting Walls
Some pictures before painting the walls. The paint color is going to be about the same as the color now. I'm still working on interior doors. A few of them will take about 7 weeks to arrive so I'm looking to see if I can find them somewhere else and have them sooner.
Wednesday, December 4, 2013
Drywall Texture and Uh-Oh!
The walls are finished with the tape and now have their mud texture. It's called Santa Fe or a 90/10, which is basically 90% of the wall is covered in smooth mud and 10% is left open. I also has a little fender bender with a pick up truck in the school parking lot. I'm sad for my little car! Nobody was hurt, thank goodness!!! I was barely moving. We were both backing out of symmetrical parking spots at the same time and the back of our cars hit. No bad feelings on either side, it's just one of those things that tend to happen in busy parking lots. I'll take my car in to get fixed sometime next week. They said it takes about 5 or 6 days to get her like new again OR as new as she can be considering she's 13 years old.
At night with some lights on a timer and a solar light out front. I have 4 outlets on a temporary construction electric meter that the electric company offers. You are not allowed to have the house powered with electric until you have a certificate of occupancy or apply for a city permit for temp. power in permanent position. The city does not want the house powered with electricity until the house is complete.
Here you can see all the nails and screws that get covered with tape and mud.
Close-up of the 90/10 texture
still wet mud
The mud is dry.
detail of corner pieces
We had a lot of rain and there was a small sink hole next to the pool deck that Thomas re-packed with dirt.
Some kind of paw print on lot.
*****
Next is painting, stucco, floorboard trim, interior doors, shower pans and walls, cabinets, fences, pool tile and plaster, pool cover, floor coverings................fix car......
Subscribe to:
Posts (Atom)



