| Mike hand cutting each corbel |
| Corbels ready to hang |
| roof trusses of turret |
| duct work |
| corbels with tongue and groove hung over master window |
| dirt truck for pool dirt BARELY fit |
| digging pool |
| figuring out where to put electric |
| Picking roof tiles. Surprisingly went with tile on left that looked hideous from up close and above but great from far away and below. |
| bathtub has to be in early for drain pipe completion |
| Halloween decor |