Some Progress with Water Meter and Sewer Tap

The process of getting a sewer tap and water meter is finally starting. The street will have to be partially closed and cut into to reach the sewer. All of the utilities got marked so that digging for the sewer tap and water meter can begin. They are supposed to start on Monday and the grading of the dirt is supposed to begin at the end of the week. I may have to delay the grading as they need water and I need one more inspection on the lot by the city before the grading can begin. We'll see....



 One final shot of the lot and its weeds before all the work begins.



Made a temporary address sign.






 Utility locations marked. Yellow is gas. Green is sewer. Blue is water. Orange is fiber-optics. Red is electric.